{"id":152524,"date":"2026-09-26T12:46:54","date_gmt":"2026-09-26T11:46:54","guid":{"rendered":"https:\/\/thepublicpulse.ng\/?p=152524"},"modified":"2026-09-26T12:54:26","modified_gmt":"2026-09-26T11:54:26","slug":"tcn-imcomtel-inspect-katsina-substation-ahead-of-installation","status":"publish","type":"post","link":"https:\/\/thepublicpulse.ng\/?p=152524","title":{"rendered":"TCN, Imcomtel Inspect Katsina Substation Ahead of Installation"},"content":{"rendered":"<p>TCN, Imcomtel Inspect Katsina Substation Ahead of Installation<\/p>\n<p>The Transmission Company of Nigeria (TCN), Katsina Sub-Region, and Imcomtel Engineering Limited have conducted a joint inspection of the Katsina 330\/132\/33kV transmission substation project ahead of its next installation phase.<\/p>\n<p>The inspection, held on Thursday, September 24, 2026, was led by the Assistant General Manager (Transmission), Katsina Sub-Region, Engr. Usman Idris, who received the Imcomtel delegation led by Engr. Emmanuel Okafor.<\/p>\n<p>The team inspected ongoing civil works, equipment locations and supporting infrastructure to ascertain readiness for the next phase.<\/p>\n<p>A major highlight was the assessment of two 100MVA power transformers delivered to the site on July 9, 2026, and their designated plinths. The transformers are expected to significantly boost transmission capacity across Katsina State and the North-West region.<\/p>\n<p>The team also evaluated four newly delivered control rooms to verify their readiness to house critical protection, monitoring and control systems.<\/p>\n<p>At the end of the visit, both parties aligned on final technical requirements and site preparations to ensure seamless coordination as the project moves closer to completion.<\/p>\n<p>The inspection team included the Principal Manager, Engr. Mustapha Idowu, and heads of technical departments.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TCN, Imcomtel Inspect Katsina Substation Ahead of Installation The Transmission Company of Nigeria (TCN), Katsina Sub-Region, and Imcomtel Engineering Limited have conducted a joint inspection of the Katsina 330\/132\/33kV transmission substation project ahead of its next installation phase. The inspection, held on Thursday, September 24, 2026, was led by the Assistant General Manager (Transmission), Katsina [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":152526,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[1],"tags":[3534,3535,462],"class_list":["post-152524","post","type-post","status-publish","format-standard","has-post-thumbnail","category-others","tag-imcomtel","tag-katsina-substation","tag-transmission-company-of-nigeria"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>TCN, Imcomtel Inspect Katsina Substation Ahead of Installation - The Public Pulse<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/thepublicpulse.ng\/?p=152524\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"TCN, Imcomtel Inspect Katsina Substation Ahead of Installation - The Public Pulse\" \/>\n<meta property=\"og:description\" content=\"TCN, Imcomtel Inspect Katsina Substation Ahead of Installation The Transmission Company of Nigeria (TCN), Katsina Sub-Region, and Imcomtel Engineering Limited have conducted a joint inspection of the Katsina 330\/132\/33kV transmission substation project ahead of its next installation phase. The inspection, held on Thursday, September 24, 2026, was led by the Assistant General Manager (Transmission), Katsina [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/thepublicpulse.ng\/?p=152524\" \/>\n<meta property=\"og:site_name\" content=\"The Public Pulse\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-26T11:46:54+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-26T11:54:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/thepublicpulse.ng\/wp-content\/uploads\/2026\/09\/IMG-20260926-WA0020.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"960\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Njoku G. O\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Njoku G. O\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/thepublicpulse.ng\\\/?p=152524#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/thepublicpulse.ng\\\/?p=152524\"},\"author\":{\"name\":\"Njoku G. O\",\"@id\":\"https:\\\/\\\/thepublicpulse.ng\\\/#\\\/schema\\\/person\\\/5393e5121f8ed641a44fbefff1cefe80\"},\"headline\":\"TCN, Imcomtel Inspect Katsina Substation Ahead of Installation\",\"datePublished\":\"2026-09-26T11:46:54+00:00\",\"dateModified\":\"2026-09-26T11:54:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/thepublicpulse.ng\\\/?p=152524\"},\"wordCount\":193,\"image\":{\"@id\":\"https:\\\/\\\/thepublicpulse.ng\\\/?p=152524#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/thepublicpulse.ng\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/IMG-20260926-WA0020.jpg\",\"keywords\":[\"Imcomtel\",\"Katsina Substation\",\"Transmission Company of Nigeria\"],\"articleSection\":[\"Others\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/thepublicpulse.ng\\\/?p=152524\",\"url\":\"https:\\\/\\\/thepublicpulse.ng\\\/?p=152524\",\"name\":\"TCN, Imcomtel Inspect Katsina Substation Ahead of Installation - The Public Pulse\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/thepublicpulse.ng\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/thepublicpulse.ng\\\/?p=152524#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/thepublicpulse.ng\\\/?p=152524#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/thepublicpulse.ng\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/IMG-20260926-WA0020.jpg\",\"datePublished\":\"2026-09-26T11:46:54+00:00\",\"dateModified\":\"2026-09-26T11:54:26+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/thepublicpulse.ng\\\/#\\\/schema\\\/person\\\/5393e5121f8ed641a44fbefff1cefe80\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/thepublicpulse.ng\\\/?p=152524#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/thepublicpulse.ng\\\/?p=152524\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/thepublicpulse.ng\\\/?p=152524#primaryimage\",\"url\":\"https:\\\/\\\/thepublicpulse.ng\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/IMG-20260926-WA0020.jpg\",\"contentUrl\":\"https:\\\/\\\/thepublicpulse.ng\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/IMG-20260926-WA0020.jpg\",\"width\":1280,\"height\":960},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/thepublicpulse.ng\\\/?p=152524#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/thepublicpulse.ng\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"TCN, Imcomtel Inspect Katsina Substation Ahead of Installation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/thepublicpulse.ng\\\/#website\",\"url\":\"https:\\\/\\\/thepublicpulse.ng\\\/\",\"name\":\"The Public Pulse\",\"description\":\"breaking news that matters\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/thepublicpulse.ng\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/thepublicpulse.ng\\\/#\\\/schema\\\/person\\\/5393e5121f8ed641a44fbefff1cefe80\",\"name\":\"Njoku G. O\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/df0a51111ba30fc60a3be1d68b533a987e1e2512dbdc0edac6833f368d860c5f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/df0a51111ba30fc60a3be1d68b533a987e1e2512dbdc0edac6833f368d860c5f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/df0a51111ba30fc60a3be1d68b533a987e1e2512dbdc0edac6833f368d860c5f?s=96&d=mm&r=g\",\"caption\":\"Njoku G. O\"},\"sameAs\":[\"https:\\\/\\\/thepublicpulse.ng\\\/\"],\"url\":\"https:\\\/\\\/thepublicpulse.ng\\\/?author=4\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"TCN, Imcomtel Inspect Katsina Substation Ahead of Installation - The Public Pulse","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/thepublicpulse.ng\/?p=152524","og_locale":"en_US","og_type":"article","og_title":"TCN, Imcomtel Inspect Katsina Substation Ahead of Installation - The Public Pulse","og_description":"TCN, Imcomtel Inspect Katsina Substation Ahead of Installation The Transmission Company of Nigeria (TCN), Katsina Sub-Region, and Imcomtel Engineering Limited have conducted a joint inspection of the Katsina 330\/132\/33kV transmission substation project ahead of its next installation phase. The inspection, held on Thursday, September 24, 2026, was led by the Assistant General Manager (Transmission), Katsina [&hellip;]","og_url":"https:\/\/thepublicpulse.ng\/?p=152524","og_site_name":"The Public Pulse","article_published_time":"2026-09-26T11:46:54+00:00","article_modified_time":"2026-09-26T11:54:26+00:00","og_image":[{"width":1280,"height":960,"url":"https:\/\/thepublicpulse.ng\/wp-content\/uploads\/2026\/09\/IMG-20260926-WA0020.jpg","type":"image\/jpeg"}],"author":"Njoku G. O","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Njoku G. O","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/thepublicpulse.ng\/?p=152524#article","isPartOf":{"@id":"https:\/\/thepublicpulse.ng\/?p=152524"},"author":{"name":"Njoku G. O","@id":"https:\/\/thepublicpulse.ng\/#\/schema\/person\/5393e5121f8ed641a44fbefff1cefe80"},"headline":"TCN, Imcomtel Inspect Katsina Substation Ahead of Installation","datePublished":"2026-09-26T11:46:54+00:00","dateModified":"2026-09-26T11:54:26+00:00","mainEntityOfPage":{"@id":"https:\/\/thepublicpulse.ng\/?p=152524"},"wordCount":193,"image":{"@id":"https:\/\/thepublicpulse.ng\/?p=152524#primaryimage"},"thumbnailUrl":"https:\/\/thepublicpulse.ng\/wp-content\/uploads\/2026\/09\/IMG-20260926-WA0020.jpg","keywords":["Imcomtel","Katsina Substation","Transmission Company of Nigeria"],"articleSection":["Others"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/thepublicpulse.ng\/?p=152524","url":"https:\/\/thepublicpulse.ng\/?p=152524","name":"TCN, Imcomtel Inspect Katsina Substation Ahead of Installation - The Public Pulse","isPartOf":{"@id":"https:\/\/thepublicpulse.ng\/#website"},"primaryImageOfPage":{"@id":"https:\/\/thepublicpulse.ng\/?p=152524#primaryimage"},"image":{"@id":"https:\/\/thepublicpulse.ng\/?p=152524#primaryimage"},"thumbnailUrl":"https:\/\/thepublicpulse.ng\/wp-content\/uploads\/2026\/09\/IMG-20260926-WA0020.jpg","datePublished":"2026-09-26T11:46:54+00:00","dateModified":"2026-09-26T11:54:26+00:00","author":{"@id":"https:\/\/thepublicpulse.ng\/#\/schema\/person\/5393e5121f8ed641a44fbefff1cefe80"},"breadcrumb":{"@id":"https:\/\/thepublicpulse.ng\/?p=152524#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/thepublicpulse.ng\/?p=152524"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thepublicpulse.ng\/?p=152524#primaryimage","url":"https:\/\/thepublicpulse.ng\/wp-content\/uploads\/2026\/09\/IMG-20260926-WA0020.jpg","contentUrl":"https:\/\/thepublicpulse.ng\/wp-content\/uploads\/2026\/09\/IMG-20260926-WA0020.jpg","width":1280,"height":960},{"@type":"BreadcrumbList","@id":"https:\/\/thepublicpulse.ng\/?p=152524#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/thepublicpulse.ng\/"},{"@type":"ListItem","position":2,"name":"TCN, Imcomtel Inspect Katsina Substation Ahead of Installation"}]},{"@type":"WebSite","@id":"https:\/\/thepublicpulse.ng\/#website","url":"https:\/\/thepublicpulse.ng\/","name":"The Public Pulse","description":"breaking news that matters","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/thepublicpulse.ng\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/thepublicpulse.ng\/#\/schema\/person\/5393e5121f8ed641a44fbefff1cefe80","name":"Njoku G. O","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/df0a51111ba30fc60a3be1d68b533a987e1e2512dbdc0edac6833f368d860c5f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/df0a51111ba30fc60a3be1d68b533a987e1e2512dbdc0edac6833f368d860c5f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/df0a51111ba30fc60a3be1d68b533a987e1e2512dbdc0edac6833f368d860c5f?s=96&d=mm&r=g","caption":"Njoku G. O"},"sameAs":["https:\/\/thepublicpulse.ng\/"],"url":"https:\/\/thepublicpulse.ng\/?author=4"}]}},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/thepublicpulse.ng\/wp-content\/uploads\/2026\/09\/IMG-20260926-WA0020.jpg","_links":{"self":[{"href":"https:\/\/thepublicpulse.ng\/index.php?rest_route=\/wp\/v2\/posts\/152524","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thepublicpulse.ng\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thepublicpulse.ng\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thepublicpulse.ng\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/thepublicpulse.ng\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=152524"}],"version-history":[{"count":1,"href":"https:\/\/thepublicpulse.ng\/index.php?rest_route=\/wp\/v2\/posts\/152524\/revisions"}],"predecessor-version":[{"id":152525,"href":"https:\/\/thepublicpulse.ng\/index.php?rest_route=\/wp\/v2\/posts\/152524\/revisions\/152525"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thepublicpulse.ng\/index.php?rest_route=\/wp\/v2\/media\/152526"}],"wp:attachment":[{"href":"https:\/\/thepublicpulse.ng\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=152524"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thepublicpulse.ng\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=152524"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thepublicpulse.ng\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=152524"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}